Been cleaning and organizing SLW's "side" of the garage, and doing the usual "winterizing" tasks, as we'll have overnight lows in the 20's, so time to roll up the hoses, collect the sprinklers, and put the hats on the outside water spigots. And cut some more wood now that the garage has been gone through, cleaned, sorted, kept/tossed, and boxed up in labeled boxes.
Oh, those speaker kits that were delivered the week I broke my hip seven months ago?
The enclosures are finally ready for coating and final assembly:
I should have had my fan running to blow the dust outside, but......I didn't, and a haze of MDF dust was everywhere:
All over my nice, clean garage, too! Yes, I had a dust mask on, but still shoulda used the fan...
Anywhoo...they're downstairs on the Operating Table so I can install the crossovers, input terminals, glue-and-screw the one side on, and coat them.
The lengths of wire are used to connect everything together inside the enclosure, and the threaded inserts are for the mounting feet.
And since my "Roto-Rooter" procedure is coming up a week from today (had the pre-op this afternoon....), I've rounded up a bunch of little "Bench Projects" to keep me busy while I recuperate. I'll be under a 35 pound weight limit, NO lifting, toting, bending low, squatting and/or working on the floor for four weeks. Glad I have a ton of "little stuff" to keep me busy, or I'd go bonkers in four weeks.....